Perth's most iconic project, Optus Stadium in Western Australia, opened its doors on the 21st of January 2018 after 36 months of construction. With a ‘fans first' approach to planning and design, the multi-purpose venue will offer an unrivalled spectator experience for a crowd of up to 60,000 (in AFL mode) with exceptional event atmosphere and cutting-edge stadium design and technology.

 

With the planning of the project being in progress over a 10-year period, the state-of-the-art venue had long been on CSR Gyprock's radar with the aim to support the project with high performance products. There were a number of other factors that assisted the Gyprock bid to supply this project, including a reputation for innovation and technical leadership – having achieved success in delivering state and national level landmark projects including Royal Adelaide Hospital (RAH) and the Victorian Comprehensive Cancer Centre (VCCC).

Gyprock were delighted to be chosen by the wall and ceiling contractor Cubic Interiors WA to supply this project, partnering with Cubic to guide product specification and providing technical support on site. 

The proximity of Gyprock's factory in Welshpool, approximately 12 kilometres from the stadium construction site, was also a major catalyst in the tender process, as it helped to save freight costs and lead-time. It also allowed for Gyprock's technical team to provide on-site assistance as required.

Loading component...

Loading component...

Loading component...

Loading component...

More case studies

Loading component...

Loading component...

Loading component...

Loading component...